/ VERIFIED METRICS

Operational plumbing in action

Three case studies documenting real labor-hour recovery, legacy ERP integrations, and deterministic error reduction across North American logistics and manufacturing operations.

Straight-on documentary shot of a legacy terminal screen running green-text AS400 software side-by-side with a modern slate-gray terminal interface in a cool-lit server room.
Straight-on documentary shot of a legacy terminal screen running green-text AS400 software side-by-side with a modern slate-gray terminal interface in a cool-lit server room.
LOGISTICS DEPLOYMENT

AS400 legacy integration

A major midwest distributor was losing eighty hours per week to manual invoice matching. We built a deterministic AI pipeline connecting their legacy AS400 ERP with incoming vendor manifests.

The integration recovered 320 labor-hours weekly and reduced data entry errors to absolute zero, requiring zero changes to their existing database infrastructure.

+ SYSTEM PROOF

Three industrial deployments

Pragmatic automation systems built for mid-market operations. We focus exclusively on back-office plumbing to deliver immediate and measurable labor-hour savings.

CASE STUDY 02
CASE STUDY 03

Automated dispatch routing

Inventory manifest parsing

A regional flatbed carrier automated their scheduling workflows. Our middleware processes freight emails, extracts dimensional constraints, and schedules trucks directly inside their legacy platform.

A light manufacturing facility faced severe bottlenecks matching bill-of-lading documents. We deployed a localized parser that reads printed manifests with absolute precision.

Results: 140 hours recovered monthly, manifest errors eliminated, and dispatchers transitioned from data entry to active fleet coordination.

Results: Processing time fell from twenty minutes to four seconds per document, completely eliminating overnight backlog spikes.

START HERE

Schedule an assessment

We start with your messiest spreadsheet or legacy integration bottleneck. Get a clear, fixed-scope operational blueprint showing exactly how many labor-hours we can recover.